Installation and initialization of the Maestro Orchestrator requires attention to the normal mechanical, power, and thermal precautions for rack-mounted equipment.
-
The rack mounting holes conform to the EIA-310 standard for racks with length 50-60 cm (19.7-23.6 inches).
Take precautions to guarantee proper ventilation to maintain good airflow at ambient temperature.
-
Unless otherwise specified, Check Point products are designed to work in an environmentally controlled data center with low levels of gaseous and dust (particulate) contamination.
The installation procedure for the Maestro Orchestrator involves these phases:
|
Phase |
Instructions |
|---|---|
|
1 |
Make sure that none of the shipping carton contents is missing or damaged. |
|
2 |
Follow the Safety Warnings for MHO-200. |
|
3 |
Pay attention to the airflow consideration within the Maestro Orchestrator and rack. See Airflow in MHO-200. |
|
4 |
Mount the Maestro Orchestrator into a rack enclosure. See Description of Sliding Rails Kit and Mounting the Appliance into the Rack |
|
5 |
Power on the Maestro Orchestrator. |