Step 1: Site Preparation
Customer Supplied Hardware
You must have these items available for installation:
- Standard 19" rack
- Eight M6x10 (or longer) rack mounting screws
- Cage bolts, nuts and screws for the racks
- Rack rails set
- Shelf
Check Point does not supply these items.