Print Download PDF Send Feedback

Previous

Next

Connecting a Second Chassis

If you have a dual Chassis environment (for Chassis high availability):

  1. For the second Chassis, repeat these steps:
    1. Step 1: Site Preparation
    2. Step 2: Installing the Chassis in a Rack
    3. Step 3: Installing Components and Connecting Power Cables
  2. Connect the second Chassis.
  3. On each SSM, connect the sync ports to the corresponding sync ports on the backup Chassis:
    • eth1-Sync in Chassis1 to eth1-Sync in Chassis2
    • eth2-Sync in Chassis1 to eth2-Sync in Chassis2
  4. Make sure to attach the RX cable to the RX ports and the TX cable to the TX ports.