Critical Information for R82.10 Jumbo Hotfix Accumulator
|
Issue |
Resolved in |
Affected Takes |
SK |
Reference |
|---|---|---|---|---|
| Starting with R82.10 Jumbo Hotfix Take 36, the log format has changed. When upgrading any Log Server to Take 36 or higher, all Log Servers must be upgraded to Take 36 or higher. Once all Log Servers are running Take 36 or higher, they do not need to run the exact same Jumbo Hotfix Take. | Take 36 and lower | PRJ-72512 | ||
| Jumbo Hotfix Accumulator is not supported on 3970 and 3980 appliances configured as ElasticXL. | Take 44 | All | sk185241 | PRJ-71350 |
|
Jumbo Hotfix Accumulator installation on Security Gateways with enabled MDPS may fail with a verification error "Installation is not allowed". |
Take 36 |
Take 6, Take 19, Take 24 |
PRJ-68861 |
|
|
In rare scenarios, the CPD process may exit because of certain Secure Internal Communication (SIC) transactions. |
Take 24 |
Take 19 |
|
PRJ-69508 |
|
Reinstallation of R82.10 Jumbo Hotfix Accumulator Take 6 may result in configuration loss. |
Take 19 |
Take 6 |
|
PRJ-69084 |
|
In a rare scenario, a security hardening change related to Multi-Portal connections may cause an unexpected Check Point Firewall restart when such a connection is terminated. |
Take 19 |
Take 6 |
|
PRJ-67928 |