Print Download PDF Send Feedback

Previous

Next

Package Installation in Clusters

When all Cluster Members are marked for installation in the Candidates List, the CDT upgrades all cluster members automatically:

CDT and the cluster Connectivity Upgrade

For version upgrades (not Hotfixes), the CDT performs Connectivity Upgrade (CU) by default, meaning that the connections are synchronized between the cluster members. If you wish to disable this behavior:

Notes:

  1. The Connectivity Upgrade for VRRP clusters is supported only when you upgrade to R80.10 version..

    When upgrading to R77.30, you need to disable the Connectivity Upgrade (otherwise, the cluster is marked as "N/A").

    To disable the Connectivity Upgrade in the Deployment Plan file, in the element <plan_settings>, add the attribute <ConnectivityUpgrade value="false" /> (see Example 5).

  2. You cannot upgrade the ClusterXL Active or VRRP Master member before you upgrade the ClusterXL Standby or VRRP Backup members.
  3. If the installation of a ClusterXL Standby or a VRRP Backup member fails, then the cluster installation stops. If the installation of the second cluster member fails, the first cluster member is not reverted.